The EIA process
- Classify the project (report, statement or registration)
- Prepare the EIA document
- Public participation and review
- Approval before construction begins
The discharge permit
After the EIA, the plant must obtain a pollution-discharge permit covering air emissions, waste-water and solid/hazardous waste — and then operate within it.
- Permit application and approval
- Emission and effluent limits
- Continuous monitoring and reporting
Ongoing obligations
- Self-monitoring and data reporting
- Hazardous-waste tracking and disposal
- Response to regulator inspections
Key point: starting construction or production before the EIA is approved is a serious violation — and serious pollution can carry criminal liability for managers. The EIA is not a formality; it gates the entire project.
Penalties
- Daily-accruing fines for continuing violations
- Suspension and licence revocation
- Criminal liability for serious offences
How we help
- Classify and prepare the EIA
- Secure the discharge permit
- Build monitoring and reporting systems
- Respond to inspections and enforcement