The EIA process

  1. Classify the project (report, statement or registration)
  2. Prepare the EIA document
  3. Public participation and review
  4. Approval before construction begins

The discharge permit

After the EIA, the plant must obtain a pollution-discharge permit covering air emissions, waste-water and solid/hazardous waste — and then operate within it.

  • Permit application and approval
  • Emission and effluent limits
  • Continuous monitoring and reporting

Ongoing obligations

  • Self-monitoring and data reporting
  • Hazardous-waste tracking and disposal
  • Response to regulator inspections

Key point: starting construction or production before the EIA is approved is a serious violation — and serious pollution can carry criminal liability for managers. The EIA is not a formality; it gates the entire project.

Penalties

  • Daily-accruing fines for continuing violations
  • Suspension and licence revocation
  • Criminal liability for serious offences