The charging-network landscape

China's charging network spans public fast-charging stations, residential slow chargers, and battery-swap stations. Both state-owned utilities and private operators (and foreign entrants) participate.

  • Public charging: fast-charge (DC) and slow-charge (AC) stations in cities and along highways.
  • Battery swap: a growing niche where standardised packs are swapped at stations.
  • Residential / destination: charging in communities, offices and shopping centres.

Grid connection and power

Charging stations are significant power loads and require grid-access approval and capacity allocation from the local grid company.

  • Grid-connection application and capacity reservation
  • Electricity-purchase and peak/off-peak tariff arrangements
  • Distributed-energy and storage integration for load management

Operating licences and approvals

  • Business registration for charging-network operation.
  • Safety and metrology approvals for charging equipment.
  • Land-use rights or lease agreements for station sites.
  • Fire-safety and construction approvals for permanent stations.

Key point: charging is not a single-licence business — it is a bundle of grid, land, safety and metrology approvals that varies by city. Entry often succeeds through local partnerships that already hold land and grid relationships.

Operational compliance

  • Pricing transparency and platform-interoperability rules
  • Equipment standards and periodic safety inspection
  • Data reporting to charging-network platforms

How we help

  1. Structure charging-network entry (WFOE vs JV vs partnership)
  2. Grid-connection and land agreements
  3. Licence and approval sequencing across cities
  4. Operating and pricing compliance