The charging-network landscape
China's charging network spans public fast-charging stations, residential slow chargers, and battery-swap stations. Both state-owned utilities and private operators (and foreign entrants) participate.
- Public charging: fast-charge (DC) and slow-charge (AC) stations in cities and along highways.
- Battery swap: a growing niche where standardised packs are swapped at stations.
- Residential / destination: charging in communities, offices and shopping centres.
Grid connection and power
Charging stations are significant power loads and require grid-access approval and capacity allocation from the local grid company.
- Grid-connection application and capacity reservation
- Electricity-purchase and peak/off-peak tariff arrangements
- Distributed-energy and storage integration for load management
Operating licences and approvals
- Business registration for charging-network operation.
- Safety and metrology approvals for charging equipment.
- Land-use rights or lease agreements for station sites.
- Fire-safety and construction approvals for permanent stations.
Key point: charging is not a single-licence business — it is a bundle of grid, land, safety and metrology approvals that varies by city. Entry often succeeds through local partnerships that already hold land and grid relationships.
Operational compliance
- Pricing transparency and platform-interoperability rules
- Equipment standards and periodic safety inspection
- Data reporting to charging-network platforms
How we help
- Structure charging-network entry (WFOE vs JV vs partnership)
- Grid-connection and land agreements
- Licence and approval sequencing across cities
- Operating and pricing compliance