Sea trials
Before delivery, the vessel undergoes sea trials to verify speed, consumption and performance against the specification.
- Scope: the trials must match the contract's performance guarantees.
- Attendance: the buyer's representatives, the class society and the flag state attend.
- Deficiencies: failures are remedied and the trial re-run before acceptance.
- Record: the trial results form part of the delivery documents.
Delivery protocol and acceptance
Delivery is effected by a delivery protocol signed by both parties, together with the handover of documents.
- Protocol of delivery and acceptance: the formal record that the vessel is delivered and accepted.
- Documents: builder's certificate, class and statutory certificates, plans, manuals and spare parts.
- Title transfer: title passes to the buyer on payment of the delivery instalment and signing of the protocol.
- Risk transfer: risk generally passes at delivery, subject to the builder's risk insurance covering the construction phase.
The defect warranty
| Item | Typical term |
|---|---|
| Warranty period | 12 months from delivery (longer for some items). |
| Scope | Defects in material, workmanship and design for which the yard is responsible. |
| Guarantee repairs | The yard repairs or replaces defective parts, or compensates for third-party repair. |
| Guarantee engineer | The yard often places a guarantee engineer on board during the period. |
Key point: the sea-trial and delivery clauses decide what "acceptable" means. Lock down the performance tolerances and the deficiency-remedy procedure in advance — a vague trial clause turns handover into a negotiation under time pressure.
Buyer's supervision during construction
- Superintendent and surveyors: the buyer's right to supervise and inspect at each construction stage.
- Milestone approvals: approval of materials, welding and major components.
- Owner-furnished equipment: the delivery, inspection and risk of owner-supplied items.
How we help
- Sea-trial terms: define scope, tolerances and the deficiency-remedy procedure.
- Delivery formalities: prepare the delivery protocol and document checklist.
- Warranty drafting: negotiate the defect warranty, guarantee repairs and engineer terms.
- Dispute handling: pursue defect and non-delivery claims after handover.