Sea trials

Before delivery, the vessel undergoes sea trials to verify speed, consumption and performance against the specification.

  • Scope: the trials must match the contract's performance guarantees.
  • Attendance: the buyer's representatives, the class society and the flag state attend.
  • Deficiencies: failures are remedied and the trial re-run before acceptance.
  • Record: the trial results form part of the delivery documents.

Delivery protocol and acceptance

Delivery is effected by a delivery protocol signed by both parties, together with the handover of documents.

  • Protocol of delivery and acceptance: the formal record that the vessel is delivered and accepted.
  • Documents: builder's certificate, class and statutory certificates, plans, manuals and spare parts.
  • Title transfer: title passes to the buyer on payment of the delivery instalment and signing of the protocol.
  • Risk transfer: risk generally passes at delivery, subject to the builder's risk insurance covering the construction phase.

The defect warranty

ItemTypical term
Warranty period12 months from delivery (longer for some items).
ScopeDefects in material, workmanship and design for which the yard is responsible.
Guarantee repairsThe yard repairs or replaces defective parts, or compensates for third-party repair.
Guarantee engineerThe yard often places a guarantee engineer on board during the period.

Key point: the sea-trial and delivery clauses decide what "acceptable" means. Lock down the performance tolerances and the deficiency-remedy procedure in advance — a vague trial clause turns handover into a negotiation under time pressure.

Buyer's supervision during construction

  • Superintendent and surveyors: the buyer's right to supervise and inspect at each construction stage.
  • Milestone approvals: approval of materials, welding and major components.
  • Owner-furnished equipment: the delivery, inspection and risk of owner-supplied items.

How we help

  1. Sea-trial terms: define scope, tolerances and the deficiency-remedy procedure.
  2. Delivery formalities: prepare the delivery protocol and document checklist.
  3. Warranty drafting: negotiate the defect warranty, guarantee repairs and engineer terms.
  4. Dispute handling: pursue defect and non-delivery claims after handover.